«Home
| Job | Release | Concrete Layout Concrete |
Insulation N/A |
Stock Drywall Drywall |
Hang Drywall Drywall |
1st Clean Drywall |
Install C.B Drywall |
Tape Drywall |
Spray Drywall |
Final Clean Drywall |
Scrape Drywall |
Pre paint pick up Drywall |
Final pick up Drywall |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Jasmin 4-101 | 2003-01 | ||||||||||||
| Jasmin 4-103 | 2003-01 | ||||||||||||
| Jasmin 4-104 | 2003-01 | ||||||||||||
| Jasmin 7-101 | 2003-01 | ||||||||||||
| Jasmin 8-101 | 2003-01 | ||||||||||||
| Rose 1-201 | Phase1-03 | ||||||||||||
| Rose 1-202 | Phase1-03 | ||||||||||||
| Rose 1-204 | Phase1-03 | ||||||||||||